To upgrade the existing fume cupboards to variable air volume and the associated ventilation to maintain correct pressure regimes to the existing laboratories on a phased basis to enable the department to remain fully operational.
• VAV and CAV ventilation to laboratories including pressure stabilisers
• Modify fume cupboards to variable air volume to achieve energy savings
• Invertor Installation to existing fume extract fans
• Heating modifications
• Medical Gases
• Chemical resistant above ground drainage
• Hot & Cold Water Services
• Air Conditioning to ancillary rooms
• Pipework & ductwork insulation
• BMS Installation
• Heat Meter Installation
• Phased Testing and Commissioning
• Fume cupboard containment tests