The project entailed the refurbishment of the castle to form new offices, classrooms etc. The project lasted 2 years and involved a lot of on site coordination and liaising with the design team due to the building being grade 1 listed.
• CAD working drawings and as fitted drawings
• Connections to existing live services within the castle
• Heating Installation
• Domestic Hot and Cold water services Installation
• Above Ground Drainage
• Air handling plant installation
• Ventilation Ductwork systems
• Sanitary ware installation
• Pipework & ductwork insulation
• BMS Installation
• Testing and Commissioning including room condition checks